A renovation and addition for Aurora Public Library District’s West Branch, reorganizing the library around clearer sightlines, more intuitive connections, and welcoming spaces for reading, learning, and gathering.
Role: Project Manager, Studio GC
Projected completion: 2027
My contribution
As project manager, I work closely with the library and our team of architects, interior designers, and engineering consultants to translate service goals into a coordinated design. My work spans space planning and design development, construction-document coordination, permitting, and the transition into construction.
I have helped resolve how public spaces, staff operations, building systems, and site improvements fit together—from the relocated entrance and revised pedestrian approach to utility conflicts, technology and security requirements, and coordination with the adjoining school. Alongside that work, I have developed the book igloo as a distinctive reading and discovery feature for the children’s area.
A more connected library
The design replaces a fragmented experience with stronger visual connections and a clearer relationship between user groups. Children’s and teen spaces have distinct identities, while shared reading areas, public computers, group-study rooms, a makerspace, and community meeting spaces support a wider range of activities.
At the heart of the children’s area, the book igloo combines curved shelving, small reading nooks, and an inviting interior. It makes browsing and reading an experience of exploration, while creating a recognizable destination within the larger library. Color, acoustic elements, and changes in scale help distinguish lively social areas from quieter places to focus.
Coordinating the existing and the new
The renovation and east addition require careful integration with the existing building and its connection to George Washington Middle School. Site utilities, shared mechanical systems, roof and daylighting changes, accessibility, and municipal reviews all shape the design. My role is to keep those requirements connected to the library’s operational needs and the experience of the people using the spaces.
Design studies and renderings
The following images show the proposed interiors during design development. Projected completion is 2027.
















Plans